The Human Resources Office of Daqing Oilfield Constructions Group Company Limited (DOCG) informs all Tanzanians with the following qualifications and who are ready to work at the Marine Tanks & Terminal Project (MTT) at Chongoleani.

1.0. Position : Preservations Lead ( 1 Post)

1.1. Qualifications: –

  • Bachelor’s degree in engineering like mechanical, construction management, or a related field.
  • Minimum 5          years  of         experience    in         preservation  management, preferably      in constructions, oil and gas,etc.
  • Strong knowledge of preservation techniques, materials, and standards.
  • Familiarity with quality control and safety protocols related to preservation.
  • Excellent organizational, communication, and problem-solving skills.
  • Proficiency in using preservation documentation and tracking tools.
  • The positions is open for nationals only (Tanzanians)

1.2. Responsibilities: –

  • Develop and implement preservation procedures and strategies for equipment and materials in line with project specifications and international standards.
  • Supervise and coordinate preservation activities on-site to ensure timely and effective execution.
  • Inspect and verify preservation measures, including coatings, coverings, and environmental controls, to prevent damage or deterioration.
  • Ensure proper documentation and record-keeping for all preservation activities.
  • Identify and resolve preservation issues in collaboration with project teams and contractors.
  • Train and guide preservation personnel to adhere to best practices and safety protocols.
  • Monitor storage           conditions      and     ensure            compliance    with     handling and     storage requirements.
  • Liaise with vendors, suppliers, and contractors to ensure preservation standards are upheld during transportation and delivery.
  • Conduct regular audits and inspections to ensure preservation compliance and continuous improvement.
  • Prepare preservation  progress         reports            and     communicate updates          to project management.
    • Duration

The Contract shall be for a specific task for the whole constructions period of the project

  • Job type

Full time employment depending on the project timeline.